← The Lantern · New Carlisle
development · road work - planned

Road construction on I-75NB between Leo St and Needmore Road northbound, Sep 10–13 — 13.1 miles from New Carlisle

The right two lanes on the Northbound side of I-75 between Leo Street and Needmore Road will shift to the exterior/right side overnight on Thursday, September 10.

Illustration: a paving machine and roller laying asphalt on a divided highway between orange barrels
Illustration · The Lantern

ODOT reports road construction on I-75NB between Leo St and Needmore Road northbound, about 13.1 miles from New Carlisle. ODOT

What the record shows

During the overnight, traffic will be maintained via the contraflow and the ramps from SR 4 and SR 48/Main Street will be temporarily cl… Reported September 10, 2026. Expected to clear by September 13, 2026. ODOT

1 source

Context

This is one of 29 records of this type (Road Work - Planned) from this source in the year preceding it. ODOT

The Lantern holds 261 records from this source in total, and 2882 for New Carlisle across every source. ODOT

1 source

By the numbers

  • Date of record: September 10, 2026 ODOT
  • Road: I-75NB between Leo St and Needmore Road ODOT
  • Direction: northbound ODOT
  • Category: Road Work - Planned ODOT
  • Distance from new carlisle: 13.1 miles ODOT
1 source
How we know this:

Assembled mechanically from the source filing and The Lantern's own record database — no AI-written prose. Every figure above appears verbatim in the cited record, which is linked on this page. ODOT

The source filing

RoadI-75NB between Leo St and Needmore Road
Directionnorthbound
CategoryRoad Work - Planned
DescriptionThe right two lanes on the Northbound side of I-75 between Leo Street and Needmore Road will shift to the exterior/right side overnight on Thursday, September 10. During the overnight, traffic will be maintained via the contraflow and the ramps from SR 4 and SR 48/Main Street will be temporarily closed. The entrance and exit ramps at Wagner Ford Road, Stanley Avenue, and Needmore Road will not be accessible during this time to allow crews to complete the shift.
Distance from New Carlisle13.1 miles
ReportedSeptember 10, 2026
Expected endSeptember 13, 2026, 11:59 p.m.
View the original at ohgo.com

Published by Ohio Department of Transportation (OHGO). This is the agency's public filing as The Lantern received it, shown with its fields named in plain English.

More from Clark County, OHWatch records like this
“Oh, No!” Have we made an error? Report it to us here! We are eager to correct the record.